The payback period of the initial price of installation and programming work is about 2 years. The final price will be determined at the site after inspection.
PRICING
The payback period is over 5 times shorter than with solar panels.
Maintenance
Self-sufficiency:
KUTUN Remap is designed to be self-sufficient and self-maintaining, eliminating the need for supplementary or external services or support, and providing a hassle-free and cost-effective solution.
HVAC system maintenance:
After the Remap conversion, the HVAC system is maintained as before.
Annual equipment inspection:
The Remap equipment undergoes yearly inspections.
Get a quick Quote
For a rough estimate, we need the following information:
- Number of ventilation units (inlet and exhaust)
- Motor sizes of the ventilation units, as indicated on the type labels
- Manufacturer, and preferably the type, model, and quantity of the HVAC controllers
- Operating hours at full power / reduced power
- Heating method (via ventilation, underfloor heating, ceiling fan heaters)
- Type of heating used in the building (oil, natural gas, or heat pumps)
- Any potential issues or special requirements
- Size of the building